Type Bedding for Drain-line & Discharge Pipe (updated 1st Dec 2021) When a concrete structure (not provided by PCS) is desired, PCS can provide the equipment package to be installed in the concrete structure in the field by the installing contractor.Ĥ:23:09 PM:782 Session_Start - Time Elapsed From Start: 00:00:00Ĥ:23:09 PM:782 Application_AcquireRequestState - Time Elapsed From Start: 00:00:00Ĥ:23:09 PM:782 PageContent Page_PreInit start - Time Elapsed From Start: 00:00:00Ĥ:23:09 PM:797 PageContent Page_PreInit end - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 _BaseStructure Page_Init start - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 _BaseStructure Page_Init end - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 PageContent Page_Init start - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 PageContent Page_Init End - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 PageContent Page_Load start - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 PageContent Page_Load end - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 _BaseStructure Page_Load start - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 _BaseStructure Page_Load end - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 PageContent Page_PreRender - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:797 _BaseStructure Page_PreRender - Time Elapsed From Start: 00:00:00.0153579Ĥ:23:09 PM:813 _BaseStructure.Master html Begin - Time Elapsed From Start: 00:00:00.0309780Ĥ:23:09 PM:844 _BaseStructure.Master html writing messages - Time Elapsed From Start: 00:00:00.Layout of Sanitary Drainage System (updated 1st Dec 2021)ĭischarge Pipe & Floor Waste Connection on Ground Level (updated 1st Dec 2021)ĭischarge Stack Connection with Backdrop to Inspection Chamber (updated 1st Dec 2021)īackdrop and Tumbling Bay Details (updated 1st Dec 2021) Steel lift stations are coated with a high solids epoxy paint system and further protected by anodes to deter cathodic action. This is more than adequate in most cases, since the anticipated flow rates are usually designed for only ten years of expansion. PUMP AND LIFT STATION LIFESPANįor the most part, a customer can anticipate a life expectancy of 15 - 20 years or more from steel lift stations. Submersible lift/pump stations do not usually include large above ground structures and tend to blend in with their surrounding environment. Although, the wet well should be large enough so excessive starting and stopping of the lift station pump will not take place.Īdvantages of submersible lift/pump stations are that they typically cost less than dry-well stations and operate without frequent pump maintenance. Should the wastewater remain too long in the wet well, septic action may occur. The wet well should be as small as possible in order to minimize detention time of the sewage. Use of the wet well for any other purpose, such as a storage reservoir for sewage, is not recommended. The purpose of a wet well is to provide a means of allowing automatic operation of the lift station with a simple control.
![below ground cantex lift station as built drawing below ground cantex lift station as built drawing](http://waterheatertimer.org/images/Electricity-from-plant-to-distribution-transformer-to-home8-550.jpg)
![below ground cantex lift station as built drawing below ground cantex lift station as built drawing](https://docplayer.net/docs-images/45/8104416/images/page_11.jpg)
Two types of pumps are available for this application, grinder pumps and solids handling pumps.Ī properly designed wet well is essential for efficient and trouble-free operation of the pump or lift station. The submersible type lift station can be utilized on low flow, low head type installations. Key elements of pump or lift stations include a wastewater treatment receiving well (wet-well), equipped with lift pumps and piping with valves, a junction box, and an equipment control panel with alarm system. Often called a lift station, these units are commonly built as a factory assembled package system.
![below ground cantex lift station as built drawing below ground cantex lift station as built drawing](https://www.cantexinc.com/Portals/0/EasyGalleryImages/1655/ImageSlider/Thumbs/newslidebright.jpg)
For instance, it may be more economical to utilize a sewage pump station to pump or lift the sewage over a ridge and let it flow by gravity to a sewage treatment plant, or to elevate sewage to pass through a sewage treatment system by gravity. PCS provides lift stations in steel, fiberglass and poured in place concrete packages (concrete is by others) and up to 5 horsepower and 4" discharge ONLY.Ī wastewater pump station may be used as a matter of economics or to overcome inadequate hydraulic head when it is obvious that no other solution is practical. Sewage / Wastewater lift stations, also called pump stations, are used for pumping wastewater or sewage from a lower to higher elevation, particularly where the elevation of the source is not sufficient for gravity flow and/or when the use of gravity conveyance will result in excessive excavation and higher construction costs.